Imperial Manufacturing
Tube
Knead contents to uniform consistency. Cut tube tip to desired bead width. Calk necessary amount into opening. Press gasket firmly into cement. Allow 1 hour for setting. Heat gradually when starting first fire for heat cure.
Cartridge
Clear all dirt, dust and debris from the aria to be cemented. Insert the cartridge into a caulking gun. Cut tip to desired bead width.
Repairs
Lightly dampen the surface area with water. Apply cement with 1.8” bead.
Gasket replacement:
Apply the least amount of cement necessary into the gasket door channel. Press the gasket firmly into the cement. Close the stove door and trim excess gasket. Clean-up excess cement with a wet cloth. Open stove door and allow 1 hour to dry. Heat gradually when starting first fire for heat cure. Not for exterior use.
CAUTION
MAY IRRITATE EYES. MAY IRRITATE SKIN. Do not get in eyes. Do not get on skin or clothing. Keep out of reach of children.
FIRST AID TREATMENT
Contains Sodium Silicate. If swallowed, call a Poison Control Centre or doctor immediately. Do not induce vomiting. If in eyes, rinse with water for 15 minutes. If on skin, rinse well with water.
APPLICATIONS
TUBE:
Installing fiberglass gasket in wood stove doors. Metal to metal, metal to masonry repairs on wood burning stoves.
CARTRIDGE:
Used for wood burning stoves. Metal to metal masonry repairs under 1/8”.
Lambro 4 inch x 8 foot UL 2158A Clothes Dryer Transition Foil Flex Duct
Honeywell Home X2P Programmable Thermostat
Vine Floor Register, Satin Nickel, 4 x 10-In.
EZ Flow II 20x20x1-In. Flat Panel Spun Fiberglass Furnace Filter
Worthington Pro Grade Propane Tank